Learn how PowerNet replaced decades of manual administrative processes with an automated system that restored control over thousands of designs for the company’s technical drawings and improved project delivery timelines.
How PowerNet Modernized 25 Years of Legacy Drawing Systems
For utilities and asset-intensive organizations, engineering drawings and technical documentation are critical to safe, reliable operations. But when drawings are scattered across legacy databases, shared drives, and manual processes, it becomes difficult to maintain version control, collaborate with contractors, and ensure teams are working from the latest information.
In this case study, discover how PowerNet Limited—one of New Zealand’s largest electricity network management companies—replaced a 25-year-old drawing management system with a modern engineering document management solution. By centralizing thousands of technical drawings and introducing structured workflows, PowerNet improved data quality, strengthened governance, and enabled better collaboration between engineering teams and external consultants.
Download the full case study to learn:
If your organization relies on accurate engineering documentation to manage critical infrastructure, this case study offers practical insights into modernizing legacy systems and building a reliable single source of truth for asset data.
Offered Free by: Accruent
See All Resources from: Accruent





